I have worked at locations that have done this both ways and I was wondering what was considered the best practice.
For a drawing, the date drawn:
Should this date be the last data modified, so if you run through tree Work In Progress revisions, should the date be representative of the last time it was modified? In this Case WIP 1.
Or
Should the date show the first date that the revision process was begun for that rev of the drawing? In this case the date should show the date WIP 1 was begun.
Also are there ISO or other internationally accepted standards for this or similar subjects?
Thanks for your input.
For a drawing, the date drawn:
Should this date be the last data modified, so if you run through tree Work In Progress revisions, should the date be representative of the last time it was modified? In this Case WIP 1.
Or
Should the date show the first date that the revision process was begun for that rev of the drawing? In this case the date should show the date WIP 1 was begun.
Also are there ISO or other internationally accepted standards for this or similar subjects?
Thanks for your input.