BigH
Geotechnical
- Dec 1, 2002
- 6,012
PLEASE KEEP THIS TO YOURSELF - ONLY SHARING WITH THIS GROUP
The Rogun Dam will be at el. 1300 m when finished. Presently it is "known" as 335 m high but the actual foundation base was el 962 instead of the "design" el. 965 - so it could be called 338 m high. The Core will be where the RCC Pad is located in the photo below. The upstream is now at el. 1140, the reservoir is at el 1070 m, about 100 m higher than original river level - have a cofferdam and then impermeable upstream temporary membranes - the reservoir permits two of the turbines to be utilized - four more to go. The downstream is at el. 1190 which is the base of the conveyor tower - the contractor will be bringing 0-400 mm alluvium from the upstream to the downstream conveyor base through access tunnels. There is something like 100 km of tunnels and adits on this project to date many of which will require hydraulic concrete plugging. The next milestone is to be at el. 1110 m - requires about 3.5 Mm3 of core material - consider it to be 0-200 moraine till-like material and 16 Mm3 of the 0-400 alluvium. The pipe dream is to finish this by August 31, 2024 - requires 3 layers per day with no loss time for winter, rain etc. Contractor says YES but everyone knows it is NO. You can find much of the information of this on the net - ROGUN DAM TAJIKISTAN.
This project is MASSIVE!!
The Rogun Dam will be at el. 1300 m when finished. Presently it is "known" as 335 m high but the actual foundation base was el 962 instead of the "design" el. 965 - so it could be called 338 m high. The Core will be where the RCC Pad is located in the photo below. The upstream is now at el. 1140, the reservoir is at el 1070 m, about 100 m higher than original river level - have a cofferdam and then impermeable upstream temporary membranes - the reservoir permits two of the turbines to be utilized - four more to go. The downstream is at el. 1190 which is the base of the conveyor tower - the contractor will be bringing 0-400 mm alluvium from the upstream to the downstream conveyor base through access tunnels. There is something like 100 km of tunnels and adits on this project to date many of which will require hydraulic concrete plugging. The next milestone is to be at el. 1110 m - requires about 3.5 Mm3 of core material - consider it to be 0-200 moraine till-like material and 16 Mm3 of the 0-400 alluvium. The pipe dream is to finish this by August 31, 2024 - requires 3 layers per day with no loss time for winter, rain etc. Contractor says YES but everyone knows it is NO. You can find much of the information of this on the net - ROGUN DAM TAJIKISTAN.
This project is MASSIVE!!