ONENGINEER
Geotechnical
- Oct 13, 2011
- 284
Text books describe SPT testing by penetration readings for three 6" intervals and counting the blow counts for the last 12 inches. i.e. ignoring the reading for the first 6".
Some drillers and software have readings for four 6" penetrations, a total of 24 inches. E.g. blow counts of 12-23-36-40. In the later case what would be the SPT value? 59 or 76 or 61.
Some drillers and software have readings for four 6" penetrations, a total of 24 inches. E.g. blow counts of 12-23-36-40. In the later case what would be the SPT value? 59 or 76 or 61.