Dear All,

I have few quick questions:

1. I would like to apply preload into a bolt to simulate HSFG bolts.

I created 3 steps: PRELOAD, FIX LENGTH, APPLIED LOAD. My bolt is M20 and I would like to apply 145 000N. Is the preload applied as N/mm^2 or overall force i.e. am I supposed to input 145 000 N as preload or 145 000N/ 314mm^2 ??

2. The purpose of the research is to study a behaviour of HSFG bolt with clearance of 2mm, 4mm and 8mm and compare load vs slip. Say I have M20 bolt but 28mm hole. Do I still create interaction between concrete and the bolt as friction i.e. once the preload * friction is overcome then I will get slip and the bolt starts to bear on the concrete with frictional interaction? Would that be correct?

Thank you

Martin
 
Replies continue below

Recommended for you

Hi Martin,

For your first inquiry, I think you have to apply a force not stress. The second inquiry is not clear to me