Hi,
A contractor has proposed propping above a first floor bay window from the outside whilst the bay window is replaced. The floors cannot be propped internally so he’s suggested bolting two Acrow props together, one on top of the other, in order to reach 5.2m height (size 4 Acrow extends only to 4.8m). Seems unlikely to be secure, is this typically ever done? If not, would appreciate possible solutions that I can discuss with them.
Thanks
A contractor has proposed propping above a first floor bay window from the outside whilst the bay window is replaced. The floors cannot be propped internally so he’s suggested bolting two Acrow props together, one on top of the other, in order to reach 5.2m height (size 4 Acrow extends only to 4.8m). Seems unlikely to be secure, is this typically ever done? If not, would appreciate possible solutions that I can discuss with them.
Thanks