nuche1973
Structural
- Apr 29, 2008
- 300
Got a project in a high humidity environment. There are a series of air flow trenches (read walls) supporting a concrete slab. From trench floor to underside of slab is 5 feet. I am looking to avoid life safety issues involved with traditional shoring, hence I am looking into using stay-in-place deck form. I am aware of the products that Vulcraft offers but due to the humidity issue the decking must be hot dipped galvanized. Something like the decking used for bridges but not so big. Any suggestions?