Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Bridge Replacement

Status
Not open for further replies.

steveyeung

Civil/Environmental
Sep 5, 2004
76
Does anybody have any idea about the time required for removing a steel bridge (of 10-15m long U-frame) carrying ballasted track?
 
Replies continue below

Recommended for you

Workig around the clock we replaced about an 8 meter RR bridge and bridge seat/ backwalls over a road in one weekend. Old and new were plate girders with bolted ties.
It would depend a lot on working conditions, location, etc.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor