I have a problem that I can't quite figure out. I am working on a cable stayed bridge and I need to calculate the buckling modes for the main girder.
The problem is that I want to prestress the cables and then add a load that drives (varys) to cause the buckling. Prestressing is Load 1 and Live load is Load 2.
I have an example for the buckling setup, that won't work
. And I can't figure it out from the manual. At least not yet. Help would be greatly appreciated.
SUBCASE 5
SUBTITLE = Prestress
TEMP(LOAD) = 1
SUBCASE 6
SUBTITLE = Live Load
LOAD = 2
STATSUB(PRELOAD)=5
STATSUB = 6
METHOD=1
BEGIN BULK
/Thomas
I have a problem that I can't quite figure out. I am working on a cable stayed bridge and I need to calculate the buckling modes for the main girder.
The problem is that I want to prestress the cables and then add a load that drives (varys) to cause the buckling. Prestressing is Load 1 and Live load is Load 2.
I have an example for the buckling setup, that won't work
![[sad] [sad] [sad]](/data/assets/smilies/sad.gif)

SUBCASE 5
SUBTITLE = Prestress
TEMP(LOAD) = 1
SUBCASE 6
SUBTITLE = Live Load
LOAD = 2
STATSUB(PRELOAD)=5
STATSUB = 6
METHOD=1
BEGIN BULK
/Thomas