I am plannig to install a capacitor Bank at 69/12.47 kV substation. The bank is 2700 kVAR three stage bank with 900 kVAR in each stages. I am wondering how you estimate the voltage transients due to 900 kVAR capacitor switching?
Substation transformer: 14/20 MVA, Impedance, 9%
Source Impedance (Ohms):
R X
+veSeq, 0.85 6.5
-ve seq, 0.85 6.5
0 Seq, 1.92 11.31
Thanks.
Substation transformer: 14/20 MVA, Impedance, 9%
Source Impedance (Ohms):
R X
+veSeq, 0.85 6.5
-ve seq, 0.85 6.5
0 Seq, 1.92 11.31