burnaway
Structural
- Sep 18, 2003
- 4
I am planchecking some plans for various sized retaining walls. The engineer is using Enercalc. The first thing I wondered is if the walls will need special inspection, so I looked down at the Masonry Data and saw that "NO" has been handwritten. However, the engineer also included the wall diagram graphic, which says "Spc Insp" right on it. I noticed that this has happened on almost every wall. Then I looked more closely, and on some of the taller walls the rebar sizes have also been handwritten, and this time the engineer corrected on the graphic too.
Obviously this is unethical. Is it something that I should report?
Obviously this is unethical. Is it something that I should report?