client want us design the closed drain piping above ground also the collecting closed drain tank is above ground.
I have few question as i have not done any above ground closed drain system
1.Do we need to run the header pipe on rack
2. All the drain pipes to be routed above ground to pipe rack
I have few question as i have not done any above ground closed drain system
1.Do we need to run the header pipe on rack
2. All the drain pipes to be routed above ground to pipe rack