QCtech
Geotechnical
- Nov 1, 2006
- 13
I have two questions: 1) I have read somewhere either ACI or a spec book that a CMU wall should not be grouted on the same day as the block was placed. Does anyone know if there is a spec for this? 2) What would turn CMU block or brick veneer the color black (new construction)?