jiao
Structural
- Dec 1, 2001
- 30
In applying Canadian bridge code to the design of a retaining wall, there is a clause 6.9.3 on compaction surcharge. Are we supposed to consider this surcharge during construction stage only? or construction and service stages?
Thanks
Thanks