Materofact
Civil/Environmental
- Feb 21, 2015
- 42
For instance, say you have uplift on structure with 30' frame centers. Simplicity may want to just call out a constant dimensioned and reinforced perimeter footing. To check uplift control, could you not just use Enercalc concrete beam designer forinstance, calculate how much footing length you need to counter the uplift, and then apply that as an PLF on that span of beam. [---> done? (for uplift at least) missing anything here? please discuss.