Hello all,
We have a contractor who is concerned that his welding on a steel embed plate, in technically uncured concrete (several days cure vice months), would cause steam generated from heat under the plate may damage or pop the plates. Is there a method to welding, etc. to avoid possible steam from "green" concrete slabs during welding? The plate is 12" square and will need to have a continuous 3/8 bead welded around it to join a post sitting on it. The weld is not going to be structural, just to join the post to the embed, weight bearing is in down direction only.
We have a contractor who is concerned that his welding on a steel embed plate, in technically uncured concrete (several days cure vice months), would cause steam generated from heat under the plate may damage or pop the plates. Is there a method to welding, etc. to avoid possible steam from "green" concrete slabs during welding? The plate is 12" square and will need to have a continuous 3/8 bead welded around it to join a post sitting on it. The weld is not going to be structural, just to join the post to the embed, weight bearing is in down direction only.