MrFurleyEIT
Structural
- Apr 21, 2007
- 37
Is anyone here familiar with AISC's Base Plate and Anchor Rod Design 2nd Edition? On Page 36, the concrete breakout cone area for group is written as [3(13) + (4)(3)(13) + 4 ] = 1849 in2. How did they get they this number? Is it a typo?
Can anyone provide the concrete breakout cone area for group and use it in a example for a base plate with four anchor rods? Thanks in advance.
Can anyone provide the concrete breakout cone area for group and use it in a example for a base plate with four anchor rods? Thanks in advance.