calculor1
Structural
- Sep 16, 2007
- 52
In conventional two way slab construction the columns are poured first with the reinforcement extending above the slab. When the slab is poured do you consider the coonection as fixed or pinned? I have always designed the column for the unbalanced moment and axial load. A recent discussion with a more senior engineer, he treats the column as pinned. Do most engineers consider the connection pinned or fixed (or somewhere between)?