eit09
Civil/Environmental
- Jul 8, 2009
- 183
I have attached a sketch of my detail in question. Basically I have an existing 24" steel pipe that will be filled and encased by concrete. The pipe must remain in place so the detailing of the ties is not a normal detail. The vertical bars are #10's and all the ties are #4 bars. I looked around but was unable to find any similar details. I also checked ACI (7.10.5.3) and believe this arrangement satisfies the code requirements. Looking for comments and/or concerns with this type of detail.