Hi all,
I am working on modifying an old building ('31), which had the beams fireproofed by concrete encasement. We are increasing the loads and the beams by themselves no longer cut it. Can anyone point to me an appropriate procedure as to how these beams can be analysed as composite? (or if somewhere it specifically says that this should not be done!)
Thanks,
-G.S
I am working on modifying an old building ('31), which had the beams fireproofed by concrete encasement. We are increasing the loads and the beams by themselves no longer cut it. Can anyone point to me an appropriate procedure as to how these beams can be analysed as composite? (or if somewhere it specifically says that this should not be done!)