Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Concrete Riser Structure at Small Concrete Dam

Status
Not open for further replies.

spieng89

Structural
Jun 30, 2015
172
Reaching out to see if anyone here has experience in designing concrete riser structures utilized in dams. I am currently in the process of the conceptual design for a replacement concrete riser structure located at a small concrete dam. The lake will be drained prior to construction of the riser structure. Essentially it'll be a 35' tall concrete box (3 sided) braced ever 7' back to concrete dam with sluice gates located at each 7' section.

Beyond ACI 318 and possibly ACI 350 are there any other code references I need look in to?

Considering load from water pressure and buoyancy in the design currently.

I will have this vetted by another engineer experienced in this type of design, but wanted to get some input before submitting prelim design.

Pic of similar structure for reference, except rise structure in this design is braced back at dam wall.

download_fuydpk.jpg
 
Replies continue below

Recommended for you

Hey just an update to this thread, found what I was looking for...Corps of Engineers put out a recent publication that is beyond helpful. Link below:

Link
 
In the USA, dams are subject to regulation; the riser will be likely be considered part of the dam.

Check to see if there are state requirements.
...every state but Alabama has a dam safety regulatory program.

There may be FEMA requirements.

If hydroelectric power is produced there will be Federal Energy Regulatory Commission (FERC) requirements.

[idea]
[r2d2]
 
this is basically an NRCS baffled riser principal spillway structure. suggest using the design procedure in the NRCS manual. NRCS typically uses ACI 350.

TR-30 Structural Design of Standard Covered Risers

qzkz2f.jpg
 
Raspivey:
I understand that the photo you showed is not of your project, it’s just an example. But, something it shows, that you might want to pay attention to is..., I would make the strongest/stiffest orientation of your concrete riser structure parallel to the face plane of the dam, so you are bracing the weaker direction to the dam.
 
Thanks all for the input, greatly appreciate it and gives me a lot to work from. Noted on FEMA and the riser orientation.
 
i suspect that if you have sluice gates, you may also need a bridge / catwalk to access the structure during flood stage. See example

2f0c6sm.jpg
 