jasonmm
Structural
- Nov 29, 2004
- 10
I have always detailed my control joints for a slab-on-grade with the reinforcement running continuous through the joint. I show a (1/4)*slab thickness cut and the steel mesh or other reinforcement running continuous. Does anyone terminate there reinforcement at the joint? Why?