WWTEng
Structural
- Nov 2, 2011
- 391
According to the pool contractor the acid will be stored securely and there should be no chance of spill. But in case there is a spill, how much the concrete mix/rebar be specified. I have never done a slab exposed to acid. Any input would be great.