To finish a combination asphalt and concrete road network, the contractor wants to use a construction process which slipforms the curbing first, then places the 10-inch thick reinforced concrete turnpads at intersections, followed by the asphalt paving between the concrete turnpads. Question is how long should the contractor wait before placing construction loads of the paver and loaded asphalt trucks on the concrete turnpads. f'c = 4,000-psi with #3 bar both ways at 12-inches O.C. Your perspectives please!