gravitate
Mechanical
- Aug 17, 2012
- 80
We have a section of pipework which is 9 tons in weight. it has to be lifted into position along with 4 2 ton tanks. The pipe is 300DN. We have to put in 2 runway beams for the purpose of construction. Would it be cheaper to chop the section of pipework up int 4 pieces and lift them up with smaller lifting equiptment or design the lifting beams for 9 tones and lift it in one go?