OCI
Civil/Environmental
- Mar 15, 2007
- 82
I'm working on a 2000sqft steel framed mezzanine with a concrete deck on metal pan. This is the first time I have used this type of floor assembly. Do you typically cut control joints in a composite slab? I have W beams on 8' centers for joists and girders at 16'. Thanks.