NXsupport
Computer
- Apr 11, 2008
- 249
Hi All,
NX8.5
TC8.3.3
If I have a part , which has 3 revs. I create a new rev 04.. simultaneously, my team member creates a rev 04 in native and sends it back to me with drawing updates.. suppose I had 3 drawing sheets and he added 4th sheet..
Now I do not want to replace his part with mine in team center. But I would like to add that sheet 04 to my drawing …
How can I do this? Is this possible OOTB? if not , is there a way to get this through NXOpen programming? Has any one run into this kind of issues?
NX8.5
TC8.3.3
If I have a part , which has 3 revs. I create a new rev 04.. simultaneously, my team member creates a rev 04 in native and sends it back to me with drawing updates.. suppose I had 3 drawing sheets and he added 4th sheet..
Now I do not want to replace his part with mine in team center. But I would like to add that sheet 04 to my drawing …
How can I do this? Is this possible OOTB? if not , is there a way to get this through NXOpen programming? Has any one run into this kind of issues?