ncarolinageo
Geotechnical
- Jul 13, 2009
- 11
I am trying to get my bosses to approve some CPT work at a project site where we have concerns over luiquefiable soils. Wwe have plenty of SPT data, as well as shear wave measurements. We feel that we have characterized the site in general and now we need to fill in the gaps. I am proposing that we use CPT to so that we can more accurately evaluate the liquefaction potential of the soils. I have been asked to provide a ballpark cost estimate. The borings would likely need to be accessed using a tracked rig - though some may be truck accessable - and would need to extend no more than 50 or 60 feet to the top of rock. I am not sure how many borings we will need - but I would estimate it on the order of 12 to 18 locations.