I have a project that is an industrial facility with a 15 ton bridge crane. We have decided to install the crane on its own separate column system as the loads are getting pretty high (42 kips down). The distance from the center of the crane to the center of the support column is currently 1’-6” (this may change). The tractive forces induced into the system put quite a bit of torsion into the support column.
I am currently designing the base of the column to be fixed against torsion. Now the questions is what do how do I design the connection at the roof? Is this connection considered fixed or pinned torsionally? I have attached a quick partial roof framing sketch.