Hello all,
API 653 Section 4.3.2
I'm a little confused on how to apply the T1 and T2 values determined by UT and averaging over the critical length L calculated.
T1 is min Taverage within L
T2 is your least minimum thickness in the corroded area exclusive of pits.
I have a corroded shell of my tank and Tmin shall not be less than 0.100" for any tank course. (calculated tmin is not above the 0.100" so my Tmin is 0.100")
If Criteria for continued operation is as follows:
1. T1 shall be greater than or equal to Tmin.
How could this ever fail since averaging will always raise the value above 0.100"?
2. T2 shall be greater than or equal to 60% tmin (and add CA if any to both).
How is this applied does this mean my T2 can actually be 0.060" (60%ofTmin) for this one isolated area?
Thank you for the help in advance.
API 653 Section 4.3.2
I'm a little confused on how to apply the T1 and T2 values determined by UT and averaging over the critical length L calculated.
T1 is min Taverage within L
T2 is your least minimum thickness in the corroded area exclusive of pits.
I have a corroded shell of my tank and Tmin shall not be less than 0.100" for any tank course. (calculated tmin is not above the 0.100" so my Tmin is 0.100")
If Criteria for continued operation is as follows:
1. T1 shall be greater than or equal to Tmin.
How could this ever fail since averaging will always raise the value above 0.100"?
2. T2 shall be greater than or equal to 60% tmin (and add CA if any to both).
How is this applied does this mean my T2 can actually be 0.060" (60%ofTmin) for this one isolated area?
Thank you for the help in advance.