Richard Baum
Electrical
- Mar 16, 2024
- 19
thread815-483510
CS Energy’s Ltd Callide C4 Management allowed maintenance staff to isolate the critical 220V DC Battery supply with the C4 unit in Service, without informing the unit C4 operator who was in control. He was left with his control panel isolated.
Process Safety proceedure had been removed by CS Energy’s management’s lack of knowledge or understanding
A critical insurance payment has been lost as it is impossible to insure against a lack of knowledge or understanding and behaviour that shows a lack of good sense of judgement.
Technical Writer gobbledygook has been used to try and hide what happened
CS Energy’s Ltd Callide C4 Management allowed maintenance staff to isolate the critical 220V DC Battery supply with the C4 unit in Service, without informing the unit C4 operator who was in control. He was left with his control panel isolated.
Process Safety proceedure had been removed by CS Energy’s management’s lack of knowledge or understanding
A critical insurance payment has been lost as it is impossible to insure against a lack of knowledge or understanding and behaviour that shows a lack of good sense of judgement.
Technical Writer gobbledygook has been used to try and hide what happened