Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Date formats

Status
Not open for further replies.

Onionterror

Bioengineer
Apr 4, 2012
14
As you can see from this image I am generation the drawn by date by driving it with sw created date. This is the correct date format specified by my company. However, my list calender does not produce my desired date format.

How do I get it to generate the desired date format?

Thanks
 
Replies continue below

Recommended for you

You are going to need to change your computer date format to match. SolidWorks pulls its date format from the computer. I played with it and Nigeria has the date format that you are wanting. But many other European countries do to so you will have to play with it.
 
Yeah i've got it set but it doesn't change the dates in the title block generated by the property tab builder "date list". See difference in attached jpg.

Thanks
 
When setting the Windows Long Date format, add 2 more y's.

i.e.
dd/mmmm/yy ---> dd/mmmm/yyyy
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor