Onionterror
Bioengineer
- Apr 4, 2012
- 14
As you can see from this image I am generation the drawn by date by driving it with sw created date. This is the correct date format specified by my company. However, my list calender does not produce my desired date format.
How do I get it to generate the desired date format?
Thanks
How do I get it to generate the desired date format?
Thanks