HELLO
IN NAJYBIA POWER STATION UNIT NO/4 CAPACITY 100MW .THE UNIT WAS IN OPERATION AND SUDDENLY SHUTTDOWN BECAUSE OF NET FAILURE AND ALSO THEY LOST THE EMERGENCY POWER .
THE DEARATOR WHICH IS OPERATED AT PRESSURE OF 5KG/CM^2 THE THICKNESS OF THE DEARATOR AND STORGE TANK IS 12.5 MM THE DESIGN PRESSURE IS 8.5KG/CM^2 .
THE PRESSURE SUDDENLY INCREASED TO 17 KG/CM^2 IN THE DEARATOR .THE DEARATOR SUDDENLY EXPLODED IN CASTROPHY WAY THE MATERIAL EJECTED IN AIR AND DESTROYED ALL THE AUXIALERY PIPING AND NEAR EQUIPMENT ASLO THE STORGE TANK IS EXPLODED .IT IS UPNORMAL CASE .
MY QUESTION .IS THAT CASE IS NORMAL AND HOW TO ANLYSIES THE CASE WILE THE WEAK AND STRONGE POINT HAS THE SAME DEFFECT..AND CAN THE EXPERT GIVE US SOME ADVICE PLEASE ..THANK AND GOD BLESS .
JAMIL/BOILER ENGINEER
IN NAJYBIA POWER STATION UNIT NO/4 CAPACITY 100MW .THE UNIT WAS IN OPERATION AND SUDDENLY SHUTTDOWN BECAUSE OF NET FAILURE AND ALSO THEY LOST THE EMERGENCY POWER .
THE DEARATOR WHICH IS OPERATED AT PRESSURE OF 5KG/CM^2 THE THICKNESS OF THE DEARATOR AND STORGE TANK IS 12.5 MM THE DESIGN PRESSURE IS 8.5KG/CM^2 .
THE PRESSURE SUDDENLY INCREASED TO 17 KG/CM^2 IN THE DEARATOR .THE DEARATOR SUDDENLY EXPLODED IN CASTROPHY WAY THE MATERIAL EJECTED IN AIR AND DESTROYED ALL THE AUXIALERY PIPING AND NEAR EQUIPMENT ASLO THE STORGE TANK IS EXPLODED .IT IS UPNORMAL CASE .
MY QUESTION .IS THAT CASE IS NORMAL AND HOW TO ANLYSIES THE CASE WILE THE WEAK AND STRONGE POINT HAS THE SAME DEFFECT..AND CAN THE EXPERT GIVE US SOME ADVICE PLEASE ..THANK AND GOD BLESS .
JAMIL/BOILER ENGINEER