Good day,
During the excavation of the piles under a bridge, one of the piles has been excavated and the machine broke down. Therefore, concretre couldnt be placed inside the pile for more than 24 hours. The machine will be fixed this night and today will be ready.
the pile is filled with bentonite though its entire depth. I know that concreting should be placed without delay after the excavation but it was an accident.
Do u think it is ok ?
During the excavation of the piles under a bridge, one of the piles has been excavated and the machine broke down. Therefore, concretre couldnt be placed inside the pile for more than 24 hours. The machine will be fixed this night and today will be ready.
the pile is filled with bentonite though its entire depth. I know that concreting should be placed without delay after the excavation but it was an accident.
Do u think it is ok ?