How do i determine the nos on anchors needed if i have to bolt a C- channel on concrete.
I can have only one Bolt on the channel along the c/s
I know the moment at the base...
The thought process that is going on is to avoid the tripping of my bolt,
How much should be my embedment, i.e what is the min embedment i need to hold..
and how do i calculate my spacing of the bolts along the channel..
Guy's please help, i thanks all of you, for your advice..