Looking at designing a waste heat recovery unit to pre-heat boiler feed water from 100 deg C to 140 at 30 barg, with hot gasses at 245 deg C at 20 mbarg. Gas is on the tube side due to solid contamination. The design is such that the shell will fit into the duct work via the duct flanges welded to the shell. Does PD5500 cater for this design? or should I be looking at a different code?. I also want to avoid expansion bellows on the shell. The tubes are 43 mmOD, Sch 40, shell is 780 mm ID. All material of construction is Carbon Steel.