For electrical submersibl pump that will be installed inside deep water well , it ws specified to install
die electric section between the pump and the column pipe to prevent electrolysis . about 3m above the pump end we will installa check valve .
I don't know so much about the die elctric section , but I know why we need to install it.
Is it ok to install the DES after the check valve or it is better yo install it directly after the pump end ?
any information about the DES is highly appreciated ...
Thanks