MarieR
Civil/Environmental
- Jul 22, 2021
- 1
I am working on a project with a 1" fuel oil supply and return line between a UST and a day tank under a generator. The pipe is specified to be schedule 40 black steel pipe, pickled. This is the same specification we have used for many years and have never had push back from the contractors. However, on this project, the contractor has asked us to waive the pickling requirement. I assume the pickling is to make sure the interior of the pipe is clean - the exterior will be coated with an epoxy paint that has its own surface prep requirements (part of the pipe is double contained underground and part is in a pipe chase across a driveway). I do not see that this is a standard fuel oil piping requirement. Is this an obsolete requirement passed down through the spec over many years? Can I delete "pickled" from this and future projects? Thanks!