I have a situation where the exterior walls between shear walls step multiple times, making the double top plate chords discontinuous.(See diagram below x=shear wall)
The floor framing runs parallel to the shear walls. I was thinking of considering the depth of the diaphragm to be the distance between the innermost exterior wall segments. Then adding blocking & straps between the floor trusses along these lines to create continuous chords. Any comments, suggestions?? Is there a better way?
Thanks,
Ice
x------
x ------
x ------x
x x
x x
x x
x x
x ------ x
x------ ------x
The floor framing runs parallel to the shear walls. I was thinking of considering the depth of the diaphragm to be the distance between the innermost exterior wall segments. Then adding blocking & straps between the floor trusses along these lines to create continuous chords. Any comments, suggestions?? Is there a better way?
Thanks,
Ice