ggc69889
Civil/Environmental
- Apr 19, 2005
- 6
I need to extend a culvert (6' each side), for that need to design a new culvert without bottom (frame) and join to the existing culvert approx. 28' long. I want to know the best way to connect the new concrete section to the existing concrete frame. The beam or slab and the walls of the frame are 8" thick. The new section will be 6' wide (each side of the existing culvert) and 28' long. Should I use dowels or some other method to connect the new concrete? How should I specify the join?