hussamabslh
Structural
- Oct 9, 2013
- 10
Hi,
I have 2 perpendicular walls which for some reason cannot be cast simultaneously and according to design drawings the connection between he two walls is a stiff connection, thus dowels must pass through shutters is there any way to do this (other than couplers)? with considering a dowel every 10 cm(I prefer not to drill the shutters). looking forward to hear your thoughts..
many thanks
I have 2 perpendicular walls which for some reason cannot be cast simultaneously and according to design drawings the connection between he two walls is a stiff connection, thus dowels must pass through shutters is there any way to do this (other than couplers)? with considering a dowel every 10 cm(I prefer not to drill the shutters). looking forward to hear your thoughts..
many thanks