jplay2519
Structural
- Oct 7, 2014
- 100
I have a storage facility that is being constructed. Floor plan consists of 3 floors of storage (slab on grade, elevated level, elevated level, roof). The elevated levels are supported by 2" composite steel deck with 2" concrete with 6x6 W1.4xW1.4 1" below slab. the slab is cracking like crazy, every 12" or 36" parallel with the span. The deck spans 10ft continuous spans and bear on cold formed metal walls. I'm not sure why its cracking so much but with the reinforcing in and we are 10 days old it seems like something with the mix maybe. The contractor said they have seen this but not as severe when finishing with large riding trowels and stay on just a bit too long. Any ideas?