precast78
Structural
- Aug 12, 2013
- 82
Guys, if you look at IBC 2012 Equation 18-1, it looks like the equation is still exactly the same as IBC 2009. However, if I am not mistaken, IBC 2012 refers to ASCE 7-10 while IBC 2009 refers to ASCE 7-05. My question is the windload. If I am not mistaken, the windload for ASCE 7-10 is amplifed (factored) already? Do you reduce the lateral load from wind so it is "service" load? Can someone enlighten me?