MUHAMMAD FAHAD RANA
Materials
- Dec 13, 2018
- 36
Back Ground:
At the time of Bidding stage, End User has added statement, "Manufacturing of Surge Vessels as per ASME Sec VIII Div-1 2021 Code".
We have understanding to above statement as "Manufacturer has to fabricate surge vessel accordance with ASME Sec VIII Div-1 2021 code without ASME Certification U" Designator, hence no involvement of Authorized Inspector required.
Question:
At the mid stage of project, End user wants involvement of Authorized Inspector and "U" Designator certification. With argument, he said show me reference or evidence in ASME Sec VIII Div-1 which show Authorized Inspector involvement not required if vessel supposed to be not ASME Certified "U" Designator.
This is totally scenario of understanding which client is failed to understand. Experts, Guide how to tackle down this issue.
BR,
Fahad
At the time of Bidding stage, End User has added statement, "Manufacturing of Surge Vessels as per ASME Sec VIII Div-1 2021 Code".
We have understanding to above statement as "Manufacturer has to fabricate surge vessel accordance with ASME Sec VIII Div-1 2021 code without ASME Certification U" Designator, hence no involvement of Authorized Inspector required.
Question:
At the mid stage of project, End user wants involvement of Authorized Inspector and "U" Designator certification. With argument, he said show me reference or evidence in ASME Sec VIII Div-1 which show Authorized Inspector involvement not required if vessel supposed to be not ASME Certified "U" Designator.
This is totally scenario of understanding which client is failed to understand. Experts, Guide how to tackle down this issue.
BR,
Fahad