chamokinawan
Structural
- Feb 9, 2015
- 43
I am doing a remodel for a two-story commercial building, shortening 2 shearwalls. On the second floor, there are two obvious wood shear walls, but they are on opposite ends of the building about 106' apart. There are 6" dia. HSS columns about 24'± on center in between the shear walls. Right below the HSS are W 12x Columns on the first floor. I'm having a hard time believing the diaphragm is spanning 106' while only from shear wall to shearwall, it's only 52' deep. I want to assume the HSS are cantilevered columns. Has anyone done a 2-story cantilevered column system with splices between floors?
Building was built in the late 80's. We're in Southern California and seismic governs, SDC=D.
Building was built in the late 80's. We're in Southern California and seismic governs, SDC=D.