Situation: Exist 8" water main, not in use anymore, invert level 5' below top of new proposed 5" SOG. The contractor is wondering if he can fill the pipe with concrete, cap it each end and leave it in place.

Personally I think at the given depth it should be OK. Concrete in the pipe will shrink a little but due to the depth of the pipe, any pressure from the slab can bridge around the pipe.

 
Replies continue below

Recommended for you

Probably doesn't need to be grouted, but grouting won't hurt. What is the alternative? Digging a trench to take the pipe out just creates another excavated and filled area which could create more problems than leaving the pipe in place.
 