cmbyrd77
Structural
- Aug 4, 2010
- 79
I have a client who wants to convert a building into a gym. There is a second floor that he wants to put circuit traing equipment on. The IBC has never really done a good job of giving live loads for rec/fitness floors. Does anyone have an idea of a safe LL to use in my design. I'm wondering if 150 psf is not enough or too much. I'm treating the equipment as a LL since it may be shifted around. Any help is greatly appreciated.