I have a structure (3-story) proposed at about 2 to 2.5 meters from a retaining wall. I am concerned about normal deflections of walls during active loading conditions that will provoke settlements on strucuture (Poisson's constant effect). Is designing for at rest condition a solution to provide a more rigid wall, or should we consider the installation of tie backs? Or, what I prefer, recommending a proper buffer distance.
Anyone with experience on this condition?