Kyle406
Civil/Environmental
- Jun 9, 2012
- 1
I am a contractor that has to tie into an existing 12" sewer forcemain. The tie in is for a temporary bypass that needs to be installed while we build a new wet well lift station in the current location of the main. In order to tie on, I will need to cut the pipe, allow the effluent to drain, and make the connection for the temp bypass. My question is: How can I drain this forcemain without allowing effluent into my excavation? Further, I am being asked to keep our "down time" to 30 min or less as we make this bypass connection. Any suggestions?