Dear Experts,
Could someone shed light on the matter that the time period to be sent for wind tunnel should be based on uncracked (SLS) structural frequency or based on cracked section (ULS) to determine the Wind forces.
If it should be uncracked (SLS), is there any reference other than the ACI 318 commentary R10.11.1 which hints of using SLS?
What is the logic of using uncracked Time period for estimating Wind forces from Wind tunnel since we know greater time period will yield greater wind forces.
Dear Experts,
Could someone shed light on the matter that the time period to be sent for wind tunnel should be based on uncracked (SLS) structural frequency or based on cracked section (ULS) to determine the Wind forces.
If it should be uncracked (SLS), is there any reference other than the ACI 318 commentary R10.11.1 which hints of using SLS?
What is the logic of using uncracked Time period for estimating Wind forces from Wind tunnel since we know greater time period will yield greater wind forces.